California Department of Public Health logo: three likenesses of people colored blue, green, and orange  
Sign-In  
Status: The water tool is functioning normally.

Water Boundary Tool



Join our list

Get updates on our project activities and new features of our website. Sign up for our newsletter here.


Contact Us

California Environmental Health Tracking Program

850 Marina Bay Pkwy, P-3
Richmond, CA 94804

(510) 620-3038
E-Mail Us
Last Edited: 2/18/2013

How This Works

For any given public water system, the process for entering a service area boundary follows these steps:

 

Step 1: Create a boundary file

  • The tool enables you to use a number of methods to create the boundary
    • Draw the boundary using the tool's editing functions
    • Upload a table of addresses to be geocoded and then converted into a boundary
    • Upload a table of coordinates for conversion into a boundary
    • Upload a zipped shapefile or a KML file
    • Import boundaries for multiple water systems from one shapefile
    • Define a boundary from individual properties (visually or by Assessor Parcel Number)
  • Because a boundary may change over time, you will be asked to indicate the time period for which the boundary is valid
  • In some cases, multiple boundary files may already exist for your water system, which you should edit or delete as needed to ensure accuracy
  • After the boundary file is created, you can edit the boundary immediately or at a later time
  • If no editing is necessary, mark boundary as completed (Step 3)

Step 2: Edit the boundary

  • Once a file is created, the boundary can be edited using one or more methods, as listed above
  • A boundary file may be edited by multiple users, as long as they are approved for that water system

Step 3: Mark boundary as completed

  • Once you are certain that the boundary is accurate and needs no further editing, mark the boundary file as "completed'
  • A completed boundary file indicates that the boundary is ready to be verified
  • Only water system staff can mark boundary files as completed

Step 4: Verify boundary

  • Completed boundaries are verified by their corresponding district engineers or local primacy agencies
  • Verification offers an additional level of quality assurance by regulators

Step 5: Repeat as needed to document past and future changes to your service area boundary

  • Create a new file to capture changes to your water system's boundary (indicate the time period for which the boundary is valid)
  • You can create a new boundary file by modifying an existing file

See Instructions and Tutorials for more detailed guidance on creating and editing a boundary.  Begin using the water tool now.